{"id":21537,"date":"2025-05-23T10:23:07","date_gmt":"2025-05-23T09:23:07","guid":{"rendered":"https:\/\/schulbau.online\/open-school-waldau-in-kassel-a-pioneering-school-building-project\/"},"modified":"2026-05-08T10:34:24","modified_gmt":"2026-05-08T09:34:24","slug":"open-school-waldau-in-kassel-a-pioneering-school-building-project","status":"publish","type":"post","link":"https:\/\/schulbau.online\/en\/open-school-waldau-in-kassel-a-pioneering-school-building-project\/","title":{"rendered":"Open School Waldau in Kassel \u2013 a Pioneering School Building Project"},"content":{"rendered":"\n<p>In the south of Kassel, a school building is being constructed by 2027 that aims to be much more than just an educational facility: the Open School Waldau (OSW) will become a meeting place, urban gateway, learning laboratory, and neighborhood anchor. The project is spearheaded by Stadt Kassel Immobilien GmbH &amp; Co. KG, represented by GWG Projektentwicklung. The school campus was designed by the Danish-German firm <a href=\"https:\/\/www.cfmoller.com\" data-type=\"link\" data-id=\"https:\/\/www.cfmoller.com\" target=\"_blank\" rel=\"noopener\">C.F. M\u00f8ller Architects<\/a>, which is setting new standards with a participatory planning process. The OSW thus takes on a pioneering role in school building \u2013 conceptually, functionally, and architecturally.   <\/p>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be2b2aa&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be2b2aa\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"http:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11529\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Open School Waldau in Kassel | \u00a9 Rendering C. F. M\u00f8ller<\/figcaption><\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>School as an Urban Component \u2013 Open, Flexible, Connected<\/strong><\/h3>\n\n<p>The OSW sees itself as a multi-layered institution: a place of learning, an experimental school of the State of Hesse, a social meeting point, and an urban space all in one. In an intensive Phase Zero process, school stakeholders and architects jointly developed a spatial vision that brings these functions together. The result is a design that rethinks school: as a three-dimensional village where learning clusters, specialized rooms, and public facilities interlock.  <\/p>\n\n<p>The ground floor houses the forum \u2013 a covered main thoroughfare that horizontally traverses the building as an internal street. Here, the library, youth center, music workshop, and a caf\u00e9 are arranged side by side. These facilities are open to both students and the neighborhood. This achieves a programmatic opening to the Waldau district, combined with permeable pathways, visible activities, and activated roof areas.   <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Architecture of Connection \u2013 Horizontal and Vertical<\/strong><\/h3>\n\n<p>The open structure is not only reflected in the program but also implemented constructively. The <a href=\"https:\/\/schulbau.online\/en\/category\/architecture\/\" data-type=\"link\" data-id=\"https:\/\/schulbau.online\/category\/architektur\/\">school building<\/a> is designed as a timber-hybrid structure with few load-bearing walls \u2013 favoring maximum adaptability and long usage cycles. The timber facade with deep reveals frames individual workspaces and creates transitional zones between indoor and outdoor spaces. Visible timber ribs on the ceilings not only provide technical support but also have pedagogical potential: they offer surfaces for attaching lights or workpieces, thus promoting creative work.   <\/p>\n\n<p>Vertically, a central staircase landscape with bleachers connects the different levels. The learning clusters for each year group are located here. Flexible spatial arrangements allow for various teaching methods \u2013 from project work to traditional frontal instruction. The upper grades feature particularly open structures that encourage situational learning and self-directed processes.   <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be2cd9d&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be2cd9d\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11532\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11532\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/05-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 Rendering C. F. M\u00f8ller<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be2e180&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be2e180\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11535\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11535\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/08-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 Rendering C. F. M\u00f8ller<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be2f385&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be2f385\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11534\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11534\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/07-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 Rendering C. F. M\u00f8ller<\/figcaption><\/figure>\n<\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Technology with Purpose \u2013 Circular Thinking in School Building<\/strong><\/h3>\n\n<p>The OSW sees itself as a demonstrator for sustainable construction. The <a href=\"https:\/\/www.montag-stiftungen.de\" data-type=\"link\" data-id=\"https:\/\/www.montag-stiftungen.de\" target=\"_blank\" rel=\"noopener\">Montag Stiftung Jugend und Gesellschaft<\/a> supports the project as part of its Open Source Initiative. Rubner Holzbau is responsible for the construction, supported by specialist planners such as Fast + Epp, Sweco, D\u00f6ring Beratende Ingenieure, as well as Transsolar and Ingenieurb\u00fcro Hausladen. Also involved are EPEA, Wenzel + Wenzel, IBC Ingenieurbau Concept, and a.g. Licht.   <\/p>\n\n<p>Circularity Passports were created for all materials used. Instead of standardized lighting values, differentiated lighting design ensures a pleasant learning atmosphere. Acoustics are aligned with real learning settings, replacing outdated normative specifications. Ventilation and climate control are organized as a hybrid system \u2013 with natural window ventilation and mechanical systems in the core zones.   <\/p>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be3181d&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be3181d\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"http:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11533\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/06-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">The central staircase landscape with bleachers | \u00a9 Rendering C. F. M\u00f8ller<\/figcaption><\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Educational Campus in the Green \u2013 Spaces for Movement and Encounter<\/strong><\/h3>\n\n<p>The outdoor facilities continue the principle of multi-layered design. They are publicly accessible and range from school gardens and sports areas to outdoor workshop zones. The roof areas are also activated: terraces, gardens, and lounge areas create space for open-air lessons and recreation. A wide external staircase connects the building with the newly emerging urban square and opens up the upper levels as a usable landscape.   <\/p>\n\n<p>The renaturalized Wahlebach stream runs directly next to the site. Formerly channeled, its expanded riverbed now serves as an integral part of a sustainable drainage concept. The adjacent green areas are integrated into the campus as experiential spaces, strengthening the connection to nature.  <\/p>\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be32b38&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be32b38\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" src=\"http:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg\" alt=\"Open School Waldau in Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11536\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-1024x576.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-300x169.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-768x432.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-1536x864.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects-600x338.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/09-OSW_Render-by-C.F.-Moller-Architects.jpg 1920w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Open-air learning landscapes: seating islands, green lounge areas, and activated roof areas with photovoltaic systems combine sustainable construction with pedagogical added value. | \u00a9 Rendering C. F. M\u00f8ller <\/figcaption><\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Setting the Course for the School Building of the Future<\/strong><\/h3>\n\n<p>With the Open School Waldau, a model project is being created that intelligently links architecture, pedagogy, and urban development. The structural implementation reflects the ambition to design schools as open, flexible, and resource-efficient spaces \u2013 embedded in the urban context, functionally extending beyond education, and structurally prepared for the demands of tomorrow. <\/p>\n\n<h3 class=\"wp-block-heading\">Construction Board<\/h3>\n\n<ul class=\"wp-block-list\">\n<li><strong>Client:<\/strong> Stadt Kassel Immobilien GmbH &amp; Co. KG represented by GWG Projektentwicklung GmbH in cooperation with the Montag Stiftung f\u00fcr Jugend und Gesellschaft<\/li>\n\n\n\n<li><strong>Architecture:<\/strong> C.F. M\u00f8ller Architects<\/li>\n\n\n\n<li><strong>Area:<\/strong> 17,000 m\u00b2<\/li>\n\n\n\n<li><strong>Address:<\/strong> Waldau, Kassel Germany<\/li>\n\n\n\n<li><strong>Year:<\/strong> 2021-2027<\/li>\n\n\n\n<li><strong>Landscape Architecture:<\/strong> C.F. M\u00f8ller Architects in cooperation with WELL concept GmbH<\/li>\n\n\n\n<li><strong>Specialist Planners:<\/strong> Fast + Epp, Sweco, D\u00f6ring Beratende Ingenieure<\/li>\n\n\n\n<li><strong>Contractor:<\/strong> Rubner Holzbau<\/li>\n\n\n\n<li><strong>Project Participants:<\/strong> Wenzel + Wenzel, EPEA, Ingenieurb\u00fcro Hausladen, Transsolar, IBC Ingenieurbau Concept, a.g. Lichtl<\/li>\n<\/ul>\n\n<p><\/p>\n\n<p><\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be34554&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be34554\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"920\" height=\"1024\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11539\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-920x1024.jpg\" alt=\"Site plan of OSW Kassel | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11539\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-920x1024.jpg 920w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-270x300.jpg 270w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-768x854.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-1381x1536.jpg 1381w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-1841x2048.jpg 1841w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Siteplan-by-WELL-concept-GmbH-600x668.jpg 600w\" sizes=\"auto, (max-width: 920px) 100vw, 920px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\"> \u00a9 C. F. M\u00f8ller<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be3586e&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be3586e\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11540\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-1024x724.jpg\" alt=\"Floor plan | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11540\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-1024x724.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-300x212.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-768x543.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-1536x1086.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-2048x1448.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/01-OSW_Plan-600x424.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 C. F. M\u00f8ller<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be368bb&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be368bb\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11541\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-1024x724.jpg\" alt=\"Floor plan | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11541\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-1024x724.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-300x212.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-768x543.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-1536x1086.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-2048x1448.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/02-OSW_Plan-600x424.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 C. F. M\u00f8ller<\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a1424be37b07&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a1424be37b07\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"724\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"11542\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-1024x724.jpg\" alt=\"Floor plan | &#xA9; Rendering C. F. M&#xF8;ller\" class=\"wp-image-11542\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-1024x724.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-300x212.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-768x543.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-1536x1086.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-2048x1448.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/05\/03-OSW_Plan-600x424.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">\u00a9 C. F. M\u00f8ller<\/figcaption><\/figure>\n<\/figure>\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Open School Waldau in Kassel sets new standards in school building: a timber-hybrid building with a public forum, activated roof areas, open learning clusters, and sustainable construction. A model project for the future of education and urban development. <\/p>\n","protected":false},"author":5,"featured_media":21539,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"footnotes":"","_tec_slr_enabled":"","_tec_slr_layout":""},"categories":[90,99],"tags":[91,87],"class_list":["post-21537","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","category-schulbau","tag-architecture","tag-schulbau"],"acf":[],"ticketed":false,"_links":{"self":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21537","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/comments?post=21537"}],"version-history":[{"count":1,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21537\/revisions"}],"predecessor-version":[{"id":21543,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21537\/revisions\/21543"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media\/21539"}],"wp:attachment":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media?parent=21537"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/categories?post=21537"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/tags?post=21537"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}