{"id":21749,"date":"2025-03-20T16:07:26","date_gmt":"2025-03-20T15:07:26","guid":{"rendered":"https:\/\/schulbau.online\/hannover-medical-school-a-hospital-building-for-the-future\/"},"modified":"2026-05-08T13:41:41","modified_gmt":"2026-05-08T12:41:41","slug":"hannover-medical-school-a-hospital-building-for-the-future","status":"publish","type":"post","link":"https:\/\/schulbau.online\/en\/hannover-medical-school-a-hospital-building-for-the-future\/","title":{"rendered":"Hannover Medical School: A hospital building for the future"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong><strong>Medicine meets urban development<\/strong><\/strong><\/h2>\n\n<figure class=\"wp-block-image size-full\"><img decoding=\"async\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/&#xA9;-HENN-_-C.F.-Moller-Architects_HENN_MHH_02_Exterior-web.jpg\" alt=\"Hannover Medical School\" class=\"wp-image-2533\"\/><figcaption class=\"wp-element-caption\">Credit: <strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n\n<p>The <strong><a href=\"https:\/\/www.henn.com\/de\/news\/ein-nachhaltiger-und-effizienter-gesundheitscampus-medizinische-hochschule-hannover\" target=\"_blank\" rel=\"noopener\">Hannover Medical School <\/a>(MHH)<\/strong> is planning a comprehensive expansion of its campus. With a concept that combines efficiency, sustainability and patient-friendly architecture, a health campus is being created that goes far beyond traditional hospital planning. The design by <strong>HENN and C.F. M\u00f8ller Architects<\/strong> defines the hospital building of the future: a functional, sustainable and at the same time human environment for patients, staff and the urban community.  <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>A health campus connected to the city<\/strong><\/h3>\n\n<p>The new buildings integrate into the existing campus as a self-contained ensemble. <strong>Three construction phases<\/strong> form a new urban building block that connects with the surrounding neighbourhoods via <strong>green corridors and passageways<\/strong>. A central element is the <strong>pedestrian-friendly hospital plaza<\/strong>, structured by a surrounding <strong>arcade \u2013 the Loop<\/strong>. This design makes orientation easier, provides protection from the elements and creates an open, welcoming environment.  <\/p>\n\n<p>The site in the east of Hanover also offers direct access to the <strong>Eilenriede city forest<\/strong>. With its <strong>green courtyards and planted roofs<\/strong>, the campus will become not only a medical centre, but also an integral part of the city\u2019s ecological network. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a13b615e1366&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a13b615e1366\" class=\"wp-block-image size-large wp-lightbox-container\"><img decoding=\"async\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"2539\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/&#xA9;-HENN-_-C.F.-Moller-Architects_HENN_MHH_01_Aerial-view-web-1.jpg\" alt=\"\" class=\"wp-image-2539\"\/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Credit: <strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a13b615e28a3&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a13b615e28a3\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"951\" height=\"810\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"2540\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152623-1.jpg\" alt=\"\" class=\"wp-image-2540\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152623-1.jpg 951w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152623-1-300x256.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152623-1-768x654.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152623-1-600x511.jpg 600w\" sizes=\"auto, (max-width: 951px) 100vw, 951px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Credit: <strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a13b615e3b62&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a13b615e3b62\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"650\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"2541\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1-1024x650.jpg\" alt=\"\" class=\"wp-image-2541\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1-1024x650.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1-300x191.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1-768x488.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1-600x381.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152820-1.jpg 1181w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><figcaption class=\"wp-element-caption\">Credit: <strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n<\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Functional architecture for maximum efficiency<\/strong><\/h3>\n\n<p>The new hospital building is organised according to functional criteria. <strong>Outpatient clinics and offices<\/strong> are housed in separate areas, while the <strong>emergency department, intensive care units and operating theatres<\/strong> are closely interconnected and linked via a <strong>shared logistics level<\/strong>. This organisation ensures short distances and optimised processes in day-to-day hospital operations. <\/p>\n\n<p>With <strong>562 beds, including 120 intensive care beds<\/strong>, a <strong>central emergency department and 24 operating theatres<\/strong>, a high-performance centre of top-level medicine is being created. The space programme is complemented by <strong>seminar rooms, laboratories and administrative units<\/strong>, underscoring the campus\u2019s university character. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"2543\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/&#xA9;-HENN-_-C.F.-Moller-Architects_HENN_MHH_04_Exterior-web.jpg\" alt=\"\" class=\"wp-image-2543\"\/><figcaption class=\"wp-element-caption\"><strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" data-id=\"2542\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/&#xA9;-HENN-_-C.F.-Moller-Architects_HENN_MHH_05_Interior-web.jpg\" alt=\"\" class=\"wp-image-2542\"\/><figcaption class=\"wp-element-caption\"><strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n<\/figure>\n\n<h3 class=\"wp-block-heading\"><strong>Sustainability as a guiding principle<\/strong><\/h3>\n\n<p>The design integrates numerous measures for <strong>resource conservation<\/strong>:<\/p>\n\n<ul class=\"wp-block-list\">\n<li><strong>Timber-hybrid construction<\/strong> in the care areas reduces the CO\u2082 footprint.<\/li>\n\n\n\n<li><strong>Recycled materials<\/strong> such as brick and aluminium minimise material use.<\/li>\n\n\n\n<li><strong>Photovoltaic systems and heat pumps<\/strong> increase energy efficiency.<\/li>\n\n\n\n<li><strong>Green roofs and fa\u00e7ades<\/strong> promote biodiversity and improve the microclimate.<\/li>\n<\/ul>\n\n<p>The compact building structures can also be flexibly adapted to future requirements. This makes the MHH campus not only a state-of-the-art hospital, but also a model for sustainable hospital construction. <\/p>\n\n<p><strong>A milestone for academic medicine<\/strong> With the planned completion of the first construction phase in <strong>2031<\/strong>, a health campus is being created in Hanover that combines architectural clarity with functional efficiency. A place that strengthens medical research, enables high-quality patient care and at the same time provides impetus for urban development. <\/p>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"631\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600-1024x631.jpg\" alt=\"\" class=\"wp-image-3736\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600-1024x631.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600-300x185.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600-768x473.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600-600x370.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/Screenshot-2025-03-20-152600.jpg 1406w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Credit: <strong>HENN \/ C.F. M\u00f8ller Architects<\/strong><\/figcaption><\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Hannover Medical School:<br \/>\nA hospital building for the future<br \/>\nMHH is planning a campus expansion that combines sustainability, functionality and urban integration. With modern structures and well-considered architecture, a health campus with exemplary character is being created. <\/p>\n","protected":false},"author":1,"featured_media":21754,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"footnotes":"","_tec_slr_enabled":"","_tec_slr_layout":""},"categories":[90],"tags":[],"class_list":["post-21749","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture"],"acf":[],"ticketed":false,"_links":{"self":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21749","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/comments?post=21749"}],"version-history":[{"count":1,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21749\/revisions"}],"predecessor-version":[{"id":21758,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21749\/revisions\/21758"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media\/21754"}],"wp:attachment":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media?parent=21749"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/categories?post=21749"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/tags?post=21749"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}