{"id":21759,"date":"2025-03-27T15:44:07","date_gmt":"2025-03-27T14:44:07","guid":{"rendered":"https:\/\/schulbau.online\/friedrich-von-keller-schule-in-ludwigsburg-renovation-as-an-opportunity-for-educational-architecture\/"},"modified":"2026-05-08T13:41:40","modified_gmt":"2026-05-08T12:41:40","slug":"friedrich-von-keller-schule-in-ludwigsburg-renovation-as-an-opportunity-for-educational-architecture","status":"publish","type":"post","link":"https:\/\/schulbau.online\/en\/friedrich-von-keller-schule-in-ludwigsburg-renovation-as-an-opportunity-for-educational-architecture\/","title":{"rendered":"Friedrich-von-Keller-Schule in Ludwigsburg: Renovation as an Opportunity for Educational Architecture"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\"><strong>Existing Architecture Reimagined<\/strong><\/h2>\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" src=\"http:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1024x683.jpg\" alt=\"Friedrich-von-Keller-Schule\" class=\"wp-image-3705\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1024x683.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-300x200.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-768x512.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1536x1024.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-2048x1366.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-600x400.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Credit: Zooey Braun<\/figcaption><\/figure>\n\n<p>Calls for demolition grow loud when old school buildings no longer meet today&#8217;s requirements. Yet, existing structures often hold potential that can be unlocked with care and foresight. In Neckarweihingen, a district of Ludwigsburg, this path was chosen. The Friedrich-von-Keller-Schule, built in the 1960s by G\u00fcnter Behnisch, was not replaced but further developed.   <\/p>\n\n<p>The school building utilizes a terraced layout that fits into the slope according to scale. No part of the building exceeds two stories. For the city, this was relevant not only in terms of design\u2014the clear structure also provides a valuable starting point pedagogically. Following a VOF procedure, h4a Gessert + Randecker Architekten were awarded the contract for the renovation and extension.   <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Extension in Dialogue with the Existing Structure<\/strong><\/h3>\n\n<p>The new spatial program is realized through two primary measures. One of these is the construction of a new two-story wing on the west side, which houses the cafeteria, additional classrooms, and a library. The wood cladding of the new building creates a restrained presence, while large glass surfaces on the ground floor enable visual connections between the interior and exterior spaces.  <\/p>\n\n<p>The new cafeteria faces the schoolyard, while the rooms above open onto the rear garden. The extension creates a coherent courtyard situation that conveys a sense of security and serves as a communicative open space. Inside, an event area with a direct connection to the foyer is created\u2014a place with multifunctional potential for everyday school life.  <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Atrium and Landscape in Dialogue<\/strong><\/h3>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"3705\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1024x683.jpg\" alt=\"\" class=\"wp-image-3705\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1024x683.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-300x200.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-768x512.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-1536x1024.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-2048x1366.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/06_h4a_ZB716-23_Zooey_Braun-600x400.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"3706\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-1024x768.jpg\" alt=\"\" class=\"wp-image-3706\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-1024x768.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-300x225.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-768x576.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-1536x1152.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-2048x1536.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/07_h4a_ZB716-35_Zooey_Braun-600x450.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p>A second structural intervention provides new access to the garden level. An atrium ensures more daylight and expands the spatial framework. The view falls on an old pagoda tree\u2014a Sophora, whose preservation influenced the floor plan design. The approach to the existing structure here incorporates not only architecture but also the landscape into the concept.   <\/p>\n\n<p>This opening does more than just improve the lighting of adjacent rooms. The connection to the outside world is also strengthened, allowing the quality of stay and orientation within the building to be reimagined. <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Structures for Contemporary Pedagogy<\/strong><\/h3>\n\n<p>Inside, the reorganization builds upon existing strengths. The spatial structure has been reorganized, and previously closed glass joints between corridors and classrooms have been uncovered. Corridors are no longer purely circulation areas but versatile learning zones.  <\/p>\n\n<p>All-day care with direct access to the garden complements the pedagogical offering. A movement room with a climbing wall was integrated on the top floor. The architecture creates differentiated learning spaces that support both communal and individual use.  <\/p>\n\n<h3 class=\"wp-block-heading\"><strong>Material and Atmosphere in Balance<\/strong><\/h3>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"3700\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-1024x683.jpg\" alt=\"\" class=\"wp-image-3700\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-1024x683.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-300x200.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-768x512.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-1536x1024.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-2048x1366.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/09_h4a_ZB716-11_Zooey_Braun-600x400.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"3701\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-1024x768.jpg\" alt=\"\" class=\"wp-image-3701\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-1024x768.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-300x225.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-768x576.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-1536x1152.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-2048x1536.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/010_h4a_ZB716-07_Zooey_Braun-600x450.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"683\" data-id=\"3699\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-1024x683.jpg\" alt=\"\" class=\"wp-image-3699\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-1024x683.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-300x200.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-768x512.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-1536x1024.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-2048x1366.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/012_h4a_ZB716-05_Zooey_Braun-600x400.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"3698\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-1024x768.jpg\" alt=\"\" class=\"wp-image-3698\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-1024x768.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-300x225.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-768x576.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-1536x1152.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-2048x1536.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/013_h4a__ZB716-13_Zooey_Braun-600x450.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"3702\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-1024x768.jpg\" alt=\"\" class=\"wp-image-3702\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-1024x768.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-300x225.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-768x576.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-1536x1152.jpg 1536w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-2048x1536.jpg 2048w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/018_h4a_ZB716-19_Zooey_Braun-600x450.jpg 600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n<\/figure>\n\n<p>Exposed concrete meets warm oak wood, and a yellow rubber floor runs through both the old and new buildings. The reduction to a few, carefully selected materials contributes to a calm spatial atmosphere. The design concept follows ecological criteria based on Cradle-to-Cradle principles.  <\/p>\n\n<p>Energy-efficient renovation, accessibility, and the removal of hazardous materials are also part of the conversion. The new school is functionally designed for all-day operation\u2014for around 300 students. However, the decisive factor remains not the size, but the interplay of spatial structure, materiality, and integration into the landscape.  <\/p>\n\n<p>The <a href=\"https:\/\/www.fvksabtsgmuend.de\" target=\"_blank\" rel=\"noopener\">Friedrich-von-Keller-Schule<\/a> represents an approach that takes what is already there seriously, complements it sensitively, and transfers it into new contexts. An example that deserves more relevance in the context of school construction. <\/p>\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-3 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a05924335637&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a05924335637\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"722\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"3697\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156-1024x722.jpg\" alt=\"\" class=\"wp-image-3697\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156-1024x722.jpg 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156-300x212.jpg 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156-768x542.jpg 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156-600x423.jpg 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104156.jpg 1187w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a059243364da&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a059243364da\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"631\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"3694\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211-1024x631.png\" alt=\"\" class=\"wp-image-3694\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211-1024x631.png 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211-300x185.png 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211-768x474.png 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211-600x370.png 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104211.png 1406w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<figure data-wp-context=\"{&quot;imageId&quot;:&quot;6a05924336fc5&quot;}\" data-wp-interactive=\"core\/image\" data-wp-key=\"6a05924336fc5\" class=\"wp-block-image size-large wp-lightbox-container\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"631\" data-wp-class--hide=\"state.isContentHidden\" data-wp-class--show=\"state.isContentVisible\" data-wp-init=\"callbacks.setButtonStyles\" data-wp-on--click=\"actions.showLightbox\" data-wp-on--load=\"callbacks.setButtonStyles\" data-wp-on-window--resize=\"callbacks.setButtonStyles\" data-id=\"3696\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226-1024x631.png\" alt=\"\" class=\"wp-image-3696\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226-1024x631.png 1024w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226-300x185.png 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226-768x473.png 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226-600x370.png 600w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104226.png 1407w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><button\n\t\t\tclass=\"lightbox-trigger\"\n\t\t\ttype=\"button\"\n\t\t\taria-haspopup=\"dialog\"\n\t\t\taria-label=\"Enlarge\"\n\t\t\tdata-wp-init=\"callbacks.initTriggerButton\"\n\t\t\tdata-wp-on--click=\"actions.showLightbox\"\n\t\t\tdata-wp-style--right=\"state.imageButtonRight\"\n\t\t\tdata-wp-style--top=\"state.imageButtonTop\"\n\t\t>\n\t\t\t<svg xmlns=\"http:\/\/www.w3.org\/2000\/svg\" width=\"12\" height=\"12\" fill=\"none\" viewBox=\"0 0 12 12\">\n\t\t\t\t<path fill=\"#fff\" d=\"M2 0a2 2 0 0 0-2 2v2h1.5V2a.5.5 0 0 1 .5-.5h2V0H2Zm2 10.5H2a.5.5 0 0 1-.5-.5V8H0v2a2 2 0 0 0 2 2h2v-1.5ZM8 12v-1.5h2a.5.5 0 0 0 .5-.5V8H12v2a2 2 0 0 1-2 2H8Zm2-12a2 2 0 0 1 2 2v2h-1.5V2a.5.5 0 0 0-.5-.5H8V0h2Z\" \/>\n\t\t\t<\/svg>\n\t\t<\/button><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"938\" height=\"662\" data-id=\"3695\" src=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104303.png\" alt=\"\" class=\"wp-image-3695\" srcset=\"https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104303.png 938w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104303-300x212.png 300w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104303-768x542.png 768w, https:\/\/schulbau.online\/wp-content\/uploads\/2025\/03\/H4A-Screenshot-2025-03-21-104303-600x423.png 600w\" sizes=\"auto, (max-width: 938px) 100vw, 938px\" \/><\/figure>\n<\/figure>\n","protected":false},"excerpt":{"rendered":"<p>Renovating the Friedrich-von-Keller-Schule: Rethinking Existing Structures in Educational Architecture<br \/>\nIn Ludwigsburg, a school from the 1960s is being transformed into a future-oriented place of learning. The renovation of the Friedrich-von-Keller-Schule demonstrates how a sensitive approach to existing buildings and new pedagogical requirements can be architecturally merged. <\/p>\n","protected":false},"author":1,"featured_media":21761,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_price":"","_stock":"","_tribe_ticket_header":"","_tribe_default_ticket_provider":"","_tribe_ticket_capacity":"0","_ticket_start_date":"","_ticket_end_date":"","_tribe_ticket_show_description":"","_tribe_ticket_show_not_going":false,"_tribe_ticket_use_global_stock":"","_tribe_ticket_global_stock_level":"","_global_stock_mode":"","_global_stock_cap":"","_tribe_rsvp_for_event":"","_tribe_ticket_going_count":"","_tribe_ticket_not_going_count":"","_tribe_tickets_list":"[]","_tribe_ticket_has_attendee_info_fields":false,"footnotes":"","_tec_slr_enabled":"","_tec_slr_layout":""},"categories":[90,99],"tags":[],"class_list":["post-21759","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-architecture","category-schulbau"],"acf":[],"ticketed":false,"_links":{"self":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21759","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/comments?post=21759"}],"version-history":[{"count":1,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21759\/revisions"}],"predecessor-version":[{"id":21764,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/posts\/21759\/revisions\/21764"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media\/21761"}],"wp:attachment":[{"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/media?parent=21759"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/categories?post=21759"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/schulbau.online\/en\/wp-json\/wp\/v2\/tags?post=21759"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}